GSMM High School

Project Team

Structural Engineer: Johnson & King
Owner: South Carolina Governor’s School for Science and Mathematics
Architect: Moseley Architects
General Contractor: Dargan Construction Company, LLC
Steel Joist Manufacturer: New Millennium Building Systems
Steel Detailer: Spectrum Fabrication Inc.
Steel Fabricator: Spectrum Fabrication Inc.
Steel Erector: Allstate Erectors, Inc.

Project Type: Non-Industrial

Project Description

Steel Joists used in the South Carolina Governor's SchoolThe South Carolina Governor's School for Science and Mathematics is a public, residential high school and early college experience for academically talented juniors and seniors from across the state. Located in Hartsville, the two-year program is ranked among the Top 20 best academic secondary schools in the nation. Completing the GSSM campus will allow the school to provide world-class educational opportunities to even more of South Carolina's most accomplished high school scholars.

What Makes This Project Interesting

From a joist design standpoint, this project was very interesting. New Millennium Building Systems was able to design the 16’-0” deep joist as a single joist in three pieces, with one layer of bridging as opposed to two separate joists with two layers of bridging. This approach saved additional erection time, was a more straightforward erection, and gave the joists a very distinct look – which was appropriate for the Science and Mathematics center. What were the advantages of the chosen structural system? From a joist design standpoint, this project was very interesting. New Millennium Building Systems was able to design the 16’-0” deep joist as a single joist in three pieces, with one layer of bridging as opposed to two separate joists with two layers of bridging. This approach saved additional erection time, was a more straightforward erection, and gave the joists a very distinct look – which was appropriate for the Science and Mathematics center.

Project Scope

What was the scope of this project? Construction of two new additions. One is a 43,000sf two story academic wing with science labs, computer labs and classrooms. The second addition is a 27,300sf gymnasium with a two story portion consisting of multi-purpose rooms, student activity areas, locker areas and storage. Materials include structural steel framing, concrete slabs, reinforced masonry, steel joists, pre-fabricated light gauge metal trusses and finishes.

Project Details

Project Construction Cost: 11,820,000.00
Joist cost, including fabrication and erection: $850,000
Size (square ft.): 70,300
Roof area using joists (square ft.): 11,422
Joist area (square ft.): 10,830
Joist engineering to delivery (# days): 21 
Joist erection (# days): 3